Head Office & Manufacturing

NSW | QLD Sales & Support

Testimonials

Enhanced efficiency at Multinational Dairy

“FlexCAM successfully delivered a system that required minimal alterations to our existing plant, reduced our footprint, increased capacity, enhanced efficiency and improved product flexibility – an outstanding result.

The FlexCAM team met the project objectives by closely collaborating with us throughout the design, development, installation and final production phases. Their flexibility was crucial in integrating design improvements and finding innovative solutions to ensure the project delivered optimal value. Despite the complex challenges posed by the intricate conveyor route, length and elevation changes, FlexCAM resolved them seamlessly without compromising the project.

The FlexCAM team consistently demonstrated a willingness to find solutions to any issues that arose, working around our production schedule and minimising disruption during the installation phase.

The design review and factory testing ensured that when the time came for cut over, the new lines were up and running well within the allocated windows, with ramp up into production achieved within 24 hours.

The project has been a great success, meeting all our requirements and ensuring a smooth ramp up to full production. We look forward to continuing our collaboration with the FlexCAM team as we develop our production toward world class efficiency and broaden our product range.”

Ian Morris, Contract Project Engineer
for Multinational Dairy and Food company.